Announcements
Attention for Customers without Multi-Factor Authentication or Single Sign-On - OTP Verification rolls out April 2025. Read all about it here.

Order of Operations (Assembly)

salih_kapucu
Advocate

Order of Operations (Assembly)

salih_kapucu
Advocate
Advocate

After the measurements are set with ilogic, I want the assembly process to be performed. Is this possible?
Note: Assemblies were not made with ilogic.

0 Likes
Reply
330 Views
3 Replies
Replies (3)

A.Acheson
Mentor
Mentor

Hi @salih_kapucu 

Could you provide more information of what you mean by measurement and assembly process? Some images/ video of what your doing manually would help. Do you have a ilogic/vba rule  you have started that you can also post? 

If this solved a problem, please click (accept) as solution.‌‌‌‌
Or if this helped you, please, click (like)‌‌
Regards
Alan
0 Likes

salih_kapucu
Advocate
Advocate

Parts created with ilogic variables were assembled manually. The lengths of the parts change with the data transmitted from the main assembly. I want to prevent the parts from seeing the mate and making an error after their size changes.

0 Likes

A.Acheson
Mentor
Mentor

It looks like your dragging the part in the video? Is that correct? Without the code and a sample of the model your using it is very difficult to see how to help. It may be the case that you need to suppress the mates and unsuppress after the diameter is changed. 

If this solved a problem, please click (accept) as solution.‌‌‌‌
Or if this helped you, please, click (like)‌‌
Regards
Alan
0 Likes