Hi there,
We have a site that has a number of gullies that we are considering filling. Is there a workflow in infraworks to create a grade line/control line/alignment line at the top of the proposed fill batter and then define fill batter grade (say 1.8H to 1V) and also define the return fill batter back into existing. Then once this is comeplted, report on the volume of fill material.