Hi everyone.
I'm working on a model in IW 2023 for quite some time and this error occurred after I created a tunnel structure in a component road. Infraworks froze, I closed it, and now every time I try to open the model the estimated time only increases and it gets stuck at 78% for some reason.
Some warnings from the log:
warn: Tunnel cutout is clockwise.
warn: exception during generation of terrain tile (l=15, r=24275, c=48218): bad allocation.
Maybe deleting the cache? Any ideas? Logs are attached here.
[PT-BR] Se essa postagem foi útil para você, clique em Curtir! Se a resposta resolveu o seu problema, clique em Aceitar Solução.
[EN-US] If it was helpful to you, click on Like! If the answer solved your problem, click on Accept Solution.
Matheus Lima
Civil Engineer | BIM for Infrastructure Enthusiast | BIM Manager | Instagram @bim_infra | LinkedIn
[EN-US] If it was helpful to you, click on Like! If the answer solved your problem, click on Accept Solution.
Matheus Lima
Civil Engineer | BIM for Infrastructure Enthusiast | BIM Manager | Instagram @bim_infra | LinkedIn
Solved! Go to Solution.