How are systems designers facing the challenge of BIM projects? Modeling in 3D the different railways systems (signaling, telecom, energy) has been done in different railway projects around the globe. Buy beyond the physical representation in 3D models, are there specific Operation and Maintenance requirements that appear necessary to have in a BIM design model for systems? If this is the case, do current methods allow designers to align their BIM Models with OM requirements?
This discussion will allow us to identify different uses cases for BIM models for systems, find out if we still need to look deeper on BIM working methods for systems, and ways to improve BIM implementation for railway systems.