the equations in code check report (pic-1 )should be referenced to the equation number in code or Clause number (Pic-2).
Pic-1
Pic-2
It is mandatory in order to check the design!!!
Hi,
What version of Revit do you use?
2018
In Steel Connections for Revit 2018 there are reference only for the AISC checks.