Comentario
06-27-2024
01:30 AM
06-27-2024
01:30 AM
"Supply From" only shows the Panel reference, it does not show the Phase and Way reference.
I want to be able to schedule and Tag electrical equipment in exactly the same way as I can Electrical Fixtures and everything else.
Sorry this reply is a bit late!