Please refer to my original post, it is all the same conduit as we always use, mainly 23mm OD in the NBN installations, but instead of a rigid configuration of the conduits using bends, elbows etc, it basically goes from A to B as the crow flies but with a 'flexible' path, the installers here actually call them 'sweeping bends' as the conduits will NEVER be installed in a straight line.

My problem in revit is that when I want draw a conduit from point A to point B, if using the path that the conduits will be installed to, revit will produce loads of minor bends, which then screws up my scheduling, therefore the only way to draw it properly, is to do an in place family, but on tower block installations etc, this will be hundreds of conduits, which makes it impossible to do, therefore we have to cheat to get the end product as revit makes un-feasible to do!