Vertical pipes should not be sloped when drawing sloped piping. Say when one connects from a fixture on the level above or draws a stack. A bizarre slope is assigned to the pipe. I have no proof but I suspect that this is a culprit of how pipes get "exploded" or disconnected long after a network is modeled (like sending pipes kilometers away from their original locations out of the building.)