Comentario
01-10-2017
01:05 AM
01-10-2017
01:05 AM
Hi
You can link set the buildings coordinates by switching on the ProjectBase Point in Revit (VG> Site> Project BasePoint
Unclip the icon and drag to a know position e.g. grid or corner of building etc. and then enter the coordinates, elevation and north offset.
this can be done with individual linked models as well.