Anuncios
Welcome to the Revit Ideas Board! Before posting, please read the helpful tips here. Thank you for your Ideas!

Copy/Monitor Concrete Cantilevers

When Copy/Monitoring Floors from a Linked Structural Model, the value for Concrete Cantilever of each model sketch line does not copy, which leaves users with a lot of manual input and coordination. The Copy/Monitor Process should, at least give the option to, copy and monitor the cantilever value of the Floor Sketch model lines.

 

Screenshot 2021-11-19 092637.png