We got an idea to link levels to phases.
When you do have an existing building, you can link the levels from the existing building to the existing phase. Than create new levels and link them to the new construction phase.
When you want to draw something, all levels are shown in the pull down menu behind the constraints and you have to scroll down to find the levels you want to use.
When you're in a view with the new construction phase, the levels from the existing phase should not be shown in the pull down menu behind the constraints, so you do not have to scroll past all levels.