Comentario
03-11-2020
09:36 PM
03-11-2020
09:36 PM
Currently we use a panel that is stretched so we can simulate a plug in busway, but only gets us so far. Having a proper busduct/busway and duct bank system would be beneficial. Ideally it would allow us to have load flow through it (from equipment [e.g. switchboard] to equipment [e.g. panelboard]) and connections along the way just like plug-in busway allows.