Linking DWG/Revit improvement
- If we link a DWG file with the option "at shared coordinates" in a view that does not show imported categories in visibility/graphics settings, Revit forces us to use "center to center" option. If we show imported categories before linking the DWG, it works fine.
- If we link a Revit file that has been georeferenced separately (without using "import coordinates" from host file - not the best practice, but has the survey point at the exact same place than host file), it's impossible to link "at shared coordinates", Revit forces us to use "center to center" option (even if Revit links are visible in visibility graphics settings). I would expect Revit to use the same linking process than DWG.
0
votos