Option to merge multiple Phases in link's Phase Mapping
I've worked on projects where the client insisted on using separate phases for demotion and new work (due to "a workflow preference") instead of using Phase Filters (as Revit was designed for). Since this caused all of their demolished elements to be invisible in our views, the only available WORKAROUND was for me to manually merge phases in their model every time I updated the link (which is slightly inconvenient in BIM360).
It would be nice if there was a checkbox to "merge forward" unmapped phases. For example, when I map their "Existing" to our "Existing", and their "Phase 1 - Construction" to our "Phase 1", their "Phase 1 - Demo" (in between their other two) would ALSO map to our "Phase 1" (and everything from both phases would be treated as if they were in the same phase - like an "on-the-fly" merge).