Thanks for the details from both of you.. very helpful.

 

The basis of my original question is founded the detailed example @oduday provided that has a load summary with 'Calculation A' showing:

  • Total connected receptacle load of 31022 VA
  • First 10,000VA computed @ 100%
  • Remaining 21022VA computed @ 50%

'Calculation A' 

Recepts.png

This seems to imply that the receptacle total demand load is 20511 (10000 + 21022 * 0.5).. but the detailed computation summarized in 'Calculation B' indicates that the receptacle demand is: Phase A @ 10310, Phase B @ 8882,  Phase C @ 10760

 

'Calculation B'

Rec.png

 

If everything is computed per phase, then what is the relevance of 'Calculation A'?