……A wave of Google translation:
The problem mentioned in this webpage is probably the same as what I want to say! I tested this method. Adding item parameters to a material is actually only for the current item, not the material itself. The added project parameters can only exist in the project or template. Once the project passes these parameters it disappears and it is not conducive to reuse. If you can add more fixed parameter information to the material. Material library can be packaged anywhere and even on Mars! The important point is that we hope that the material library can add some cost information that has been audited by the financial department (these cost dataMay come from ERP system). This is done to make it easier to generate an accurate budget list directly in the REVIT schedule. And reverse verification. No need to convert data to Excel. This is just as difficult as going through Mount Everest. I think Autodesk can help us not to cross Mount Everest
这个网页中提到问题大概跟我想表达的一致!我测试过这种方法。为材质添加项目参数实际上只针对于当前项目,而不是这个材质本身。所添加的项目参数只能存在于项目中或者样板。一旦进行项目传递这些参数就消失了不利于重复利用。如果能给材质添加更多的固定参数信息。将可以把材质库打包运用到任何地方甚至火星上!重点是我们希望材质库能添加一些已经被财务部门审核过的成本信息(这些成本数据可能来自ERP系统)。这样做是为了更方便直接在REVIT 明细表中生成一张准确的预算清单。和逆向验证。不必再把数据转换到Excel。这简直就像要穿越珠穆朗玛峰一样艰难。我认为Autodesk可以帮助我们不必穿越珠穆朗玛峰