Moving canvas in timeline shouldn't recalculate model
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hi,
I have a model that deals with some free form lofts that measure 80x50 meters (terrain for a building). This makes recalculating the parts very slow in itself, but that I can deal with.
However, I just attached another canvas and was wondering why the model recalculates when moving it in the timeline, as a canvas doesn't do anything to the model, does it?
Not high on the priority list, but maybe there are other features that don't affect the model which could be moved without recalculation.
Thanks,
Stefan