Move entire Project?

Move entire Project?

furmanr
Contributor Contributor
404 Views
0 Replies
Message 1 of 1

Move entire Project?

furmanr
Contributor
Contributor

Hi!

 

Just a peeve, that's been bothering me for some time now:

 

When I first opened my Fusion account it was for working on projects for a single client, but since then we've taken on multiple projects for other clients as well, and the account became our main workhorse.

Since then, every client got their own top level folder or "Project" as Fusion puts it.

 

However, we still have a lot of unsorted top level "Projects", which we'd like to sort to their corresponding client folders (which are, "Projects" as well). It's making an unnecessery mess, and this is especially true for the legacy work of that old singular client (with whom we still work with to this day, so we can't really Archive them away).

 

Anyway, in essence, what I'd like to do, is to move a top level "Project" inside a different top level "Project". I've found that this can't be done in Fusion, but rather through the online dashboard using a workaround - while it's impossible to move a Project directly, it is possible to select all it's contents and move them to a folder inside of another Project. All hunky-dory, but it seems to copy some of the designs (including folders and subfolders) and then throw an error and get stuck (see the attached screenshot).

After some trial and error I found that this only happens when it hits a design with linked components inside of it.

 

Now this is the real buzzkill for me.. I can't really go through hundreds of designs breaking links and such - is there any way to do this efficiently? Or maybe, if Fusion's paradigm doesn't permit this directly, could an admin do it manually for us or are we asking too much?

 

Thanks!

 

0 Likes
405 Views
0 Replies
Replies (0)