- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hello,
I am running a retrofitted Bridgeport Boss CNC with a Saunders Machine Works Fixture Plate. Part blank size is about 3"x.75". Using the modular vise system I can fit, 6 Parts running longways in the Y directions (3 dual station vises), and 3 additional parts down at the bottom of the work envelope running longways in the X direction (3 single stations vises). My issue arises when I'd like to minimize tool changes by using multiple WCS offsets and prioritizing by tool. I cant seem to figure out a way, using the multiple WCS, to tell fusion that 3 of the parts are located at 90 degrees to the others. I know this can be achieved using the patterning function but I auto probe each parts location prior to running the program and this is easier to achieve using the multiple WCS. In short, how do I inform fusion, using multiple WCS, that 3 of the parts are not in the same orientation as the other 6 so I can order by Tool? Any help would be much appreciated.
Solved! Go to Solution.