- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
TPF Ingeniería | Efficiency Underground: Málaga Metro's BIM and IFC 4x3 Integration
The extension of line 2 in the Málaga Metro project was done using the Building Information Modeling (BIM) methodology, considering the complexities of construction in an established urban area. Significant efforts were invested in various tasks, including the creation of a 3D model for a cut and cover tunnel with slurry walls, coordination of different disciplines using Navisworks, and conducting 5D budget analysis.
Those attending the event will witness a real-life example of a civil infrastructure project that employed Autodesk software. Numerous challenges were encountered during the project's design phase. Specifically, the utilization of specialized tools in Civil 3D to calculate lofted volumes and the adoption of parametric modeling tools for water supply networks, sanitation, and electricity were crucial in developing the models. Furthermore, noteworthy advancements were made in the IFC exportation processes by Autodesk for the IFC 4X3 version. The presentation will showcase multiple models to illustrate these concepts.
Speaker:

