Hi @engineguy 

With T1 the first spindle is started, the second spindle is started with T2. The coordinate system of the first spindle is G54. The second spindle has two tools - left and right. The left one is operated with the coordinate system G55 and the right one with G56. The movements to the axes are always kept. It's a big problem because when working spindle T2, I have to change axis Z with axis X. Can that change be done in the postprocessors when starting T2? T1 and T2 are the tool numbers.