Hi, I have created a section with elevation datum of 50' and soffit of 60' when placing pipe its created on 0' elevation(if my z value is 0' it should be @ 50' right? because of elevation datum) and hanger Rods starts from 60'. Is this suppose to work like this(revit user new to Fabrication CADMEP).
Solved! Go to Solution.
01-24-2022
05:26 AM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
01-24-2022
05:26 AM
The elevation datum is an imaginary floor. Fabrication parts will reference that imaginary floor when reporting their elevation.
So, if you set the datum to 50'-0" and draw the pipe at 0'-0" then the pipe would report its elevation at -50'-0".
The pipe is located 50'-0" BELOW the imaginary floor.
If you draw the pipe at 55'-0" then the pipe would report its elevation at 5'-0".