Hello,
I am relatively new to Flexsim and I am trying to model following:
Scenario:
Operator gets an order --> Operator walks to the cart buffer and picks it up --> Walks to the Processor --> Attaches Cart to the Processor --> Sets up Processor --> Operator Walks away as Processor is doings its job --> Operator Picks up the Cart once Processor is complete --> Takes the Cart back to the processor area and places it
To note:
1) There is a define path that they have to follow
2) Cart has Uptime
Goal of the model:
- Optimize number of carts required (increase Processor uptime)
- Optimize number of Operators required
So far, I am in the process of building the model using Process Flows (particularly trying to use Synchronize function). However, I want to the cart to starting syncing when the Operator stops near 3D shape. That way, it can mimic Operator is walking with the cart. I have used Travel Network Node to determine the path to be traveled.
Question:
Is there a way to model what I am trying do? Or is thee better way to model the scenario?
I am not able to attach .fsm model to this post as it is not supported, hence attached it as a zip file.