Running Simulation for Multiple Days

Running Simulation for Multiple Days

Aaupadhye
Not applicable
301 Views
1 Reply
Message 1 of 2

Running Simulation for Multiple Days

Aaupadhye
Not applicable

[ FlexSim 23.0.8 ]

Hey everyone,


I was wondering if there was a way to run my simulation for multiple days. The way I have it right now is that it runs from 8-5 and just stops at the end, however, I want it to be continuous so that in the event there is a buildup of boxes from the previous day then the operators can work on it the next day as well.


wcocmodel-2.fsm


Thanks,

Amit



0 Likes
Accepted solutions (1)
302 Views
1 Reply
Reply (1)
Message 2 of 2

julie_weller
Not applicable
Accepted solution

Hey @Aaupadhye! You can just remove the stop time on the top bar. If you go to the Run Tim and click the drop down, deselect the stop times. You might have to add a down time or worker schedule though so that it acts like the end of a real day!