Production Scheduling (EDD, SPT) using Flexsim

Production Scheduling (EDD, SPT) using Flexsim

arimba_w
Not applicable
5 Views
6 Replies
Message 1 of 7

Production Scheduling (EDD, SPT) using Flexsim

arimba_w
Not applicable

[ FlexSim 18.2.2 ]

Hi there, I'd like to ask, so i have the production scheduling on each machine for every job, here i'm applying dispatching rules: EDD and SPT. The system is jobshop. Unfortunately, I find it hard to assign my scheduling results to the Flexsim model to assess the result.

Here's my initial model dataset-2.fsm based on jobshop tutorial (https://answers.flexsim.com/articles/22945/list-examples-6.html).

Thank you very much for the help.

0 Likes
Accepted solutions (1)
6 Views
6 Replies
Replies (6)
Message 2 of 7

joshua_s
Not applicable

For your steps, does A1 correspond to M1, and so on? EDD is based off data that wasn't provided in the model.

0 Likes
Message 3 of 7

professor_yuan
Not applicable

I have same problem,want set queue to solve the conflict,don't work

0 Likes
Message 4 of 7

arimba_w
Not applicable

Hi there, yes it is, Sir

0 Likes
Message 5 of 7

arimba_w
Not applicable

Hi @Joshua S, Thank you very much for the reply... I think i've finished this problem by changing my framework, but unfortunately i encounter a new problem. would you mind to check my new question

https://answers.flexsim.com/questions/58859/transporter-assignment-sequence-based-on-globaltab.html

Thank you very much..

0 Likes
Message 6 of 7

joshua_s
Not applicable

@Professor Yuan

Could you post your question separately with the model you are building? This helps keeps things organized and allows us to answer any specific questions pertaining to your model.

0 Likes
Message 7 of 7

joshua_s
Not applicable
Accepted solution

See this Post for the continuation and solution to this question.

0 Likes