Message 1 of 9
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
[ FlexSim 22.2.0 ]
i have a scenario where my 90-degree merges should stop for the blue line and wait till the bag pass. There should be a gap between bags. also, the blue conveyor needs to be bi-directional how i can attain it.Merge and bidirectional.fsm
Solved! Go to Solution.