Sandy,
we have done two similar solutions ages ago, but none of them used Excel:
- First one was a warehouse with dynamically added put-away and retrieval tasks. This was based on an Orcale database though, but I do not see, why you should not be able to do that through Excel. You just have to connect to it through ODBC rather than the Excel interface. I haven't done this project by myself, so that is all I am able to explain to you.
- Second is also a fairly old one (V6), but still running. This has been established by the client himself. They wrote an own OPC client long before OPC was integrated with FlexSim and used that to get the online production data into FlexSim.
I do not see FlexSim itself to display both, current operation real time data as well as predicted (I assume simulated) data. I see that happening using a third application to display the realtime data and call FlexSim to run a simulation and provide predicted data that way.....but I am not a developer 😉
Good luck
Ralf