Message 1 of 4
how to tell flexsim my production orders
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
[ FlexSim 22.2.2 ]
Hi everyone, I would like to be able to indicate to Flexsim our production schedule, for example 300 pieces of reference A, then 200 pieces of reference B, etc. All theses pieces go through the same machines and follow the same circuit.