Message 1 of 8
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
[ FlexSim 22.0.1 ]
Helo, i have problem on the timetable. How to make with some condition:
1.it have 5 working days (120 hours with 8 hours warm-up)
2. After 5 days of work, the line is completely stopped for a weekend and in the next week a new warm-up is required.
3. Available work time is reduced by cleaning of machine (15 minutes per shift) and a rest pause for operator (15 min per shift) and is equal to 465 minutes per shift for processor and 450 min for operator
4. Hope u can use the date based
Solved! Go to Solution.