How to make the forklift transport more than one item per time

How to make the forklift transport more than one item per time

matheus_rosa
Not applicable
780 Views
14 Replies
Message 1 of 15

How to make the forklift transport more than one item per time

matheus_rosa
Not applicable

[ FlexSim 16.0.1 ]

I have a queue that will stack 50 objects. I would like to make my forklift wait until this amount is achieved to make the transportation between the queue and the sink.

Thanks.

Accepted solutions (1)
781 Views
14 Replies
Replies (14)
Message 2 of 15

Matthew_Gillespie
Autodesk
Autodesk
Accepted solution

Attached is a model where I used Process Flow to control the Transporter.

165-multitransport.png

The queue pushes to an Item List and the token in the Process Flow tries to pull off a specified number (you can set it in the Number Required activity). Once there's that many items in the queue the Transporter is acquired and used to travel to the queue, load all the items, travel to the conveyor, and unload all the items.



Matthew Gillespie
FlexSim Software Developer

Message 3 of 15

philboboADSK
Autodesk
Autodesk

You could just check the Perform Batching box on the Queue's Properties and set its Target Batch Size to 50.

Then set the Capacity of the Transporter to 50.

175-50-items-transporter.png



Phil BoBo
Sr. Manager, Software Development
Message 4 of 15

zixuan_xiong
Not applicable

That's smart! Can you paste your referencing to the conveyor here? I'm in a older version and it's showing blank.

0 Likes
Message 5 of 15

Matthew_Gillespie
Autodesk
Autodesk

What version are you using?



Matthew Gillespie
FlexSim Software Developer

0 Likes
Message 6 of 15

Matthew_Gillespie
Autodesk
Autodesk

Here is a slightly modified version of that same model for version 7.7



Matthew Gillespie
FlexSim Software Developer

0 Likes
Message 7 of 15

matheus_rosa
Not applicable

@Matthew Gillespie

I don't know why my task is not working. My forklift is following a path (with nodes) to deliver the products to 3 racks. However to figure out the Process Flow control I deleted 2 of my racks so it would look like yours. I tried to use your coding making the input/output changes but it returns me the error on the photo when the transporter is almost arriving at the rack.

185-error.png

0 Likes
Message 8 of 15

regan_blackett
Autodesk
Autodesk

It looks like you are missing a reference to the thing you want to unload in your Unload task. Maybe a label value for that activity wasn't set correctly?

Message 9 of 15

Matthew_Gillespie
Autodesk
Autodesk

If Regan's suggestion doesn't fix it you can attach your model here and we'll take a look at it.



Matthew Gillespie
FlexSim Software Developer

0 Likes
Message 10 of 15

matheus_rosa
Not applicable

@Matthew Gillespie I figured out the problem. Just one thing, when the transporter goes to the rack I feel like he puts one object per time, what can I do to make him put the 50 objects with 1 move. And also how can I add my 3 racks to the unload code?

0 Likes
Message 11 of 15

Matthew_Gillespie
Autodesk
Autodesk

I converted your comment about adding 3 racks to this model into a new question. I would have converted the other part of this comment into a new question as well, but I'm not sure what you want exactly. Do you want all the items to be put in the same bay? If you ask this as a new question and outline what behavior you'd like to see we'll get an answer for you.



Matthew Gillespie
FlexSim Software Developer

0 Likes
Message 12 of 15

arunTTT2P
Advocate
Advocate

Hi Phil,

I just tried to use the same concept while loading items on an AGV using AGV network. But the AGV is not picking the items as you mentioned. Please see the attached model and can you explain the reason?

Regards,

Arun KR

Message 13 of 15

michael_machado
Not applicable

How did you make the entry transfer appear in the conveyor object without doing any connection from Queue to the straight conveyor?

0 Likes
Message 14 of 15

Matthew_Gillespie
Autodesk
Autodesk

I created the entry transfer by connecting a fixed resource to the conveyor. Then I right clicked on the entry transfer and selected the Remove Connections option.



Matthew Gillespie
FlexSim Software Developer

0 Likes
Message 15 of 15

kavitha_s
Not applicable

I'm struggling with the same issue. @Arun KR @phil.bobo @Matthew Gillespie @Matheus Rosa

(the same concept while loading items on an AGV using AGV network.- need the AGV to transport 4 items at the same time)

0 Likes