[ FlexSim 17.0.2 ]
Even though there is a RMB/copy option for activities in a process flow, it doesn't seem to do anything.
I find that I now first have to copy/paste the entire block of snapped together activities, then remove the activity I want from the block, select and copy that item, and the delete the rest of the block that was copied.
Is there a better way, or if not, could that be added?