How can i change conveyor max content?

How can i change conveyor max content?

ektjf264
Not applicable
384 Views
5 Replies
Message 1 of 6

How can i change conveyor max content?

ektjf264
Not applicable

Hi, I want to change max content of conveyor.

I mean, Only one flow item can use conveyor, and other flow item wait the line.

I guess, if I use output or input control trigger I can do this.

But, I want to know . other way to solve this.

Thank you.

0 Likes
Accepted solutions (1)
385 Views
5 Replies
Replies (5)
Message 2 of 6

joerg_vogel_HsH
Mentor
Mentor

Use a Zone in Process Flow.

0 Likes
Message 3 of 6

ektjf264
Not applicable

Zone Activity can Control Max content of each conveyor?

0 Likes
Message 4 of 6

zac_h_adsk
Autodesk
Autodesk
Accepted solution

Here are 3 different ways you can control a conveyors max qty.

1) When using a queue before the conveyor you can set Triggers to add to or subtract from a Global Variable to keep track of what the qty on the conveyor.

conveyor-qty-control-using-3d.fsm

2) When using decision points you can compare the qty (subnodes.length) of the conveyor

conveyor-qty-control-using-decision-points.fsm

3) You can also use Process Flow to look at a Global Variable to know the qty on a conveyor. (In this model the Decide and Delay is a longer form of just using a zone with a max content.)

conveyor-qty-control-using-process-flow.fsm

Message 5 of 6

joey_a
Not applicable
Hi, in your "using process flow" example you have an EntryTransfer node on the conveyor. How did you do that without connecting Queue1 to the conveyor? The only way I can get an EntryTransfer node is if I connect an upstream queue to it, but that doesn't work well with my process flow. Any help would be great!
0 Likes
Message 6 of 6

zac_h_adsk
Autodesk
Autodesk

If you make a connection between the Queue and the conveyor it will create the EntryTransfer. You can then right click on the EntryTransfer and click on Remove Connections.