How can a crane move two flow items?

How can a crane move two flow items?

gabriela_vr
Not applicable
60 Views
2 Replies
Message 1 of 3

How can a crane move two flow items?

gabriela_vr
Not applicable

[ FlexSim 21.1.1 ]

In my simulation, at the beginning,PROCESS FLOW TWO SOURCE.fsm there's an item already in a processor (POS6). The crane has to pick up the first item from the sink and drop it in the first processor (POS4), after that goes to pick up the item that is waiting in POS6 and drops it in POS7. Then goes back to POS4, Picks up the item and drops it in POS6, and so on. How can I make this happen?

The sequence is

1-4-6-7-4-6-1-4-6-7-4-6.....

0 Likes
Accepted solutions (1)
61 Views
2 Replies
Replies (2)
Message 2 of 3

julio_r
Not applicable
Accepted solution

Hello Gabriela,

Here is an example on how to do it, of course there is other ways. You will see that I deactivated your logic, but the one I did is simple and is explained in the processFlow.

process-flow-two-source_solved.fsm

0 Likes
Message 3 of 3

gabriela_vr
Not applicable
Thank you so much!!
0 Likes