Hello I want to calculate the use of an installation with a Flexsim model and I am using average WIP to calculate it. My question is if the graph takes in acount the breaks or the whole time of work?
0 Likes
Accepted solutions (1)
128 Views
1 Reply
Reply (1)
Message 2 of 2

tanner_p
Not applicable
Accepted solution

The Stats Collector does take breaks into account when calculating that statistic. If you prefer it didn't, you can create a custom Stats Collector that would ignore times when the machine is down.