New drawing, Wrong material on duct
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
The material aplied to the new duct is not according the specification default.
i.e: default material for the specification is galvanised steel, but it assigns RVS to the new ductwork.