Survey Points

8 REPLIES 8
Reply
Message 1 of 9
Anonymous
467 Views, 8 Replies

Survey Points

Anonymous
Not applicable

Can anyone help me with survey points.  I have multiple drawings set to the same working folder with points in each drawing, how do I keep the point numbers correct? How do I keep point numbers form writing over each other when I insert them into the same drawing? To clarify the issue I need point number to start numbering from the last point in a drawing without the points being inserted into the current drawing.

Thanks

William

0 Likes

Survey Points

Can anyone help me with survey points.  I have multiple drawings set to the same working folder with points in each drawing, how do I keep the point numbers correct? How do I keep point numbers form writing over each other when I insert them into the same drawing? To clarify the issue I need point number to start numbering from the last point in a drawing without the points being inserted into the current drawing.

Thanks

William

8 REPLIES 8
Message 2 of 9
wfberry
in reply to: Anonymous

wfberry
Mentor
Mentor

Perhaps I am not quite following you here.  If you have Drawing No 1 points ending with 10323,  In Drawing No 2 renumber points starting with 10324.  This is done by adding or subtracting "all" beginning with the lowest number in Drawing No. 2.

 

Bill

 

0 Likes

Perhaps I am not quite following you here.  If you have Drawing No 1 points ending with 10323,  In Drawing No 2 renumber points starting with 10324.  This is done by adding or subtracting "all" beginning with the lowest number in Drawing No. 2.

 

Bill

 

Message 3 of 9
ESchomberg
in reply to: Anonymous

ESchomberg
Collaborator
Collaborator
I am sorry but your post is a bit confusing to me.... I do not quite understand your situation or question
0 Likes

I am sorry but your post is a bit confusing to me.... I do not quite understand your situation or question
Message 4 of 9
rl_jackson
in reply to: Anonymous

rl_jackson
Mentor
Mentor
Use a survey database if there all part of the same project on the same coordinate system

Rick Jackson
Survey CAD Technician VI

Did you find this post helpful? Feel free to Like this post.
Did your question get successfully answered? Then click on the ACCEPT SOLUTION button.

EESignature

0 Likes

Use a survey database if there all part of the same project on the same coordinate system

Rick Jackson
Survey CAD Technician VI

Did you find this post helpful? Feel free to Like this post.
Did your question get successfully answered? Then click on the ACCEPT SOLUTION button.

EESignature

Message 5 of 9
TerryDotson
in reply to: Anonymous

TerryDotson
Mentor
Mentor

If you were to consider third party software and need a tool to quickly report the points used (and unused) in multiple drawings, along with details of any points duplicated (and in which files), take a look at the Point Harvest tool in C3D Point Tools.

0 Likes

If you were to consider third party software and need a tool to quickly report the points used (and unused) in multiple drawings, along with details of any points duplicated (and in which files), take a look at the Point Harvest tool in C3D Point Tools.

Message 6 of 9
Anonymous
in reply to: TerryDotson

Anonymous
Not applicable

What is the second group of points going to be used for that you don't want to add them to the drawing.

I have in the past created a new file and xrefed it to the original file. That way I can see the location of the 2nd group and not have them in the first file.

 

 

Dave Z.

The old geezer

0 Likes

What is the second group of points going to be used for that you don't want to add them to the drawing.

I have in the past created a new file and xrefed it to the original file. That way I can see the location of the 2nd group and not have them in the first file.

 

 

Dave Z.

The old geezer

Message 7 of 9
Anonymous
in reply to: rl_jackson

Anonymous
Not applicable
I use a survey database to view all the points in the project, but some of the points groups are from different drawings in the project. The current drawing in the project database has only the points from that drawing. I want to create new points in the current drawing but not have it overwrite the points from other groups in the database when I bring them in to that current drawing. This was not an issue in 2004 because all the points were in the project database and it would not let you write over preexisting point numbers.
0 Likes

I use a survey database to view all the points in the project, but some of the points groups are from different drawings in the project. The current drawing in the project database has only the points from that drawing. I want to create new points in the current drawing but not have it overwrite the points from other groups in the database when I bring them in to that current drawing. This was not an issue in 2004 because all the points were in the project database and it would not let you write over preexisting point numbers.
Message 8 of 9
Anonymous
in reply to: Anonymous

Anonymous
Not applicable

I use a survey database to view all the points in the project, but some of the points groups are from different drawings in the project. The current drawing in the project database has only the points from that drawing. I want to create new points in the current drawing but not have it overwrite the points from other groups in the database when I bring them in to that current drawing. This was not an issue in 2004 because all the points were in the project database and it would not let you write over preexisting point numbers.

 
0 Likes

I use a survey database to view all the points in the project, but some of the points groups are from different drawings in the project. The current drawing in the project database has only the points from that drawing. I want to create new points in the current drawing but not have it overwrite the points from other groups in the database when I bring them in to that current drawing. This was not an issue in 2004 because all the points were in the project database and it would not let you write over preexisting point numbers.

 
Message 9 of 9
rl_jackson
in reply to: Anonymous

rl_jackson
Mentor
Mentor

If I'm understanding you correctly, they problem lies in the fact the the SDB is not linked to the drawing in Civil 3D. There totally disconnected, unlike (bad word) LDD projects.


Rick Jackson
Survey CAD Technician VI

Did you find this post helpful? Feel free to Like this post.
Did your question get successfully answered? Then click on the ACCEPT SOLUTION button.

EESignature

0 Likes

If I'm understanding you correctly, they problem lies in the fact the the SDB is not linked to the drawing in Civil 3D. There totally disconnected, unlike (bad word) LDD projects.


Rick Jackson
Survey CAD Technician VI

Did you find this post helpful? Feel free to Like this post.
Did your question get successfully answered? Then click on the ACCEPT SOLUTION button.

EESignature

Can't find what you're looking for? Ask the community or share your knowledge.

Post to forums  

Rail Community


Autodesk Design & Make Report