The particular pipe system is for a piped irrigation ditch with a Q=105 cfs. There is no variability due to runoff events. The flow is set. I set the External inflow at the uppermost node to be Baseline inflow=105 cfs.
When I perform the analysis, the program is calculating varying Peak Flow during Analysis varying from 107-120 cfs at each Link and Junction. What am I missing? It seems like a designer should be able to set the flow rate for exactly what they require for their design and the software should not be injecting biased results when not instructed to do so!
Solved! Go to Solution.