Simplifying TIN surfaces created from USGS 1M DEM data
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I have a colleague who has been dealing with 1M DEM data at our office. The typical workflow is to bring the raw data into Infraworks, generate an IMX model, import that model into Civil3D, crop the surface, then simplify the surface using edge contraction as many times as he sees fit. Recently I went to UAV conference and learned quite a bit about the modern accuracy standards for digital elevation models. That being said I challenged that he could remove points from the original data set and still certify 1 foot or possibly even 2 foot contours. The ASPRS 2014 standards are quite clear and I don't understand how you can removed points and still say surface accuracy is maintained. Furthermore, without getting very technical, one can see dramatic changes in the contour lines when performing surface simplification. How then can the surface accuracy be maintained when the model changes so much between simplifications. Common sense would tell you that too very different contours can not both be correct. Any thoughts or experiences would be appreciated.
Alumni