Hello forum,
A good portion of my work requires me to set up sewer networks with the Pipe Network tool. What I have always done is layout my sewer main with the Pipe network tool and then laying out my laterals as regular poly lines. Some utility companies in Utah require elevation labels on every wye, cleanout, bend and home connection for laterals. This ends up eating a bunch of my time up.
The reason I end up having to create my laterals with poly lines is because when I add a null structure to my sewer main it breaks the main at that structure. For example, if I have a 200LF 8" Sewer Main and I have two manholes and one connection the main would not read 200LF between the manholes but instead it would read two 100LF mains.
Is there a way that I can add a Wye Structure or null structure that would allow me to place a lateral connection into the main without disrupting the continuity of the sewer main?
Thanks,
Sam