Hydraflow Express - Hydrology: Required Storage Analysis - Total Precip. Problem
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
First post...hopefully my screenshot displays properly.
I'm trying to run a quick prelim storage volume calculation by comparing pre and post development conditions and limiting my post-development flow to my pre-development flow via "Target Q" in the inputs. I am running an SCS analysis with a synthetic distribution so that (as I understand from reading the user manual) it will use the IDF curves I set up by entering regression equation coefficients published by my Dept. of Transportation. When I run the analysis, the output tells me the total precip. is 32.16 inches, which isn't right. I'm only running a 50 year storm because the DOT doesn't have regression coefficients for the 100-yr storm, but the 100-yr/24-hr rainfall depth is only about p = 14". I've read through the manual and can't figure out where this number is coming from, and the storage volume it's telling me is required is larger than I expected.
[Edit: I did double check the regression coefficients and compared (spot checked) the resulting IDF curve values to my DOT IDFs and they're spot on. I also included better screenshots.]