How to create an offset of existing groond in the View section?
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
How is the volume of drainage behind the embankment with a thickness of 20 cm along the cross section and above the existing ground automatically calculated automatically? Stripping Top Soil is not the solution.