I have a finished subdivision project but I discovered that the topographical survey is displaced in relation to the real position of the land. Now I need to reposition the whole drawing and all the elements (parcels, surfaces and alignment) to the actual position on the model, but when I do it with the move command, everything is rebuilding and messed up.
Edit 1: I added an image that shows the project and the position I want to place it, which would be where the red polyline is
Solved! Go to Solution.