Thought I'd remind myself about EPP and after completing a simple exercise my conclusion is that it isn't fit for purpose.

 

I've run it twice and used a 250m x 250m grid once with a specified boundary and once without

 

With Boundary

 

The reported totals below are way out...

 

EPPBoundaryTotalScreenshot 2023-06-10 121408.png

Volumes in yellow have been repeated - the upper one is wrong and shouldn't be there and there are also volumes reported along the top edge (which is correct and as expected)

 

 

EPPBoundaryScreenshot 2023-06-10 121408.png

 

Without Boundary

 

The volumes as reported are reasonably close to those reported using a Volume surface (717,255 cu.m. Cut 697,488 cu.m. Surplus volume = 19,767 cu.m.) and the surplus is 21,858 cu.m with the difference between volume surface and Earthworks plan without boundary being 21,858-19,767 = 2,091 cu.m. 

 

EPPNoBoundaryTotalScreenshot 2023-06-10 121408.png

 

The upper volume in yellow is reported correctly and isn't a copy of the lower yellow volume (which is good) but the red volume along the top have been omitted and which in all equate to the difference in volume noted above (2,091 cu.m.) 

 

EPPNoBoundaryScreenshot 2023-06-10 121408.png

I created parcels for all of the 250 x 250 squares and ran a parcel volume report and it is at the edges where the problems appear.

 

Whilst the Earthworks Plan Production is considerably quicker than creating and naming parcels and having the cut/fill reported in the drawing is a timesaver but I am reluctant to use it if I can't rely on the outputs - has anyone got any good result from Earthworks Plan Production or should I just resign myself to the fact that it is unfit for purpose? 

neilyj (No connection with Autodesk other than using the products in the real world)
Did you find this post helpful? Feel free to Like this post.
Did your question get successfully answered? Then click on the ACCEPT SOLUTION button.

EESignature


AEC Collection 2025 UKIE (mainly Civil 3D UKIE and IW)
Win 11 Pro x64, 1Tb Primary SSD, 1Tb Secondary SSD