Looking for other points of view -
We have a very large (1500 ac)- long term project(10-15yrs). We are not sure the best way to structure the various simultaneous aspect of the drawings. There are historical features, present features to be demolished, 39 mb topographical map, subdivision of the property, a creek dredging, and it goes on and on.
What would one suggest - keeping one base drawing and referencing into each separate related project, or is there a better way to do this?