Corridor Transitions vs Targets
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I'm old fashioned. So I've tended to use targets to control corridor widths. This time I used a couple of transitions and thought they worked well. So I'm trying to use them for the whole corridor. Being, shall I say, Cautious. I wanted to have a check on the transitions. I took the polylines drawn for the EP in the design plan, copied them to another drawing and turned them into alignments. Then I DRefed them into the Corridor drawing so I could display them in the section editor. That helped me pick up some errors I had made. However.
There are areas controlled by transitions that do not match the alignments created from the EP. Mostly a couple of inches but a couple of feet in some cases. I can understand some differences where the transitions occur in curves. Its Difficult to draw curve transitions knowing only the width as each end of the transition.
My question is: Has anyone done such a comparison and did you find it was better to hold the transitions in the Corridor rather than drafted polylines?
Allen Jessup
CAD Manager - Designer
Did you find this post helpful? Feel free to Like this post.
Did your question get successfully answered? Then click on the ACCEPT SOLUTION button.