Corridor baseline targeting
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Building a 'Target' baseline with a 'Target' coded template sub assembly, I am finding success implementing multiple corridor baselines, one for a target surface and one as a grade surface with respective surfaces. I can the run a baseline along a feature line projected to the target surface set 'relative' elevation creating a dynamic link without the circular reference problem, this works great to redefine curbs, sidewalks, ramps parking , retaining walls etc, by only changing the parent corridor profile, since the feature lines are 'relative' to the target all assemblies update and assume their new elevation.