Thanks, It is workable workflow, but seem to have a lot of hiccup and
frustration. Design Bid Build process where Design team can resist to
upgrade their model.
Understand from my college that a link block model took 10mins to open up
in 2014 version itself and if we got to e-transmit, another
unnecessary action and time going to consume.
In our country, consultants (usually Giant Elephant which walk slow and
steady) will upgrade revit version very carefully coz it is need to perform
the whole coorporate.
Any specific reason why 2014 is dropped from processing?