Hi there everyone,
I have a bunch of questions, that I would like to have answered since I couldn't find that anywhere:
So far I worked using the followiung method and I don't know if it's the right method to work on a project:
After creating a construction with the architectural plan of my plant, I created a construct for the pipes, one for the electrical trays and equipments and one for the structure.
I added those as overlays.
1 - Is this the correct method to do things or can I just add all objects in one unique drawing?
The size of the drawing with the pipes is around 330 Mb and is by far the biggest one I have so far since it contains many MV-Blocks (Pumps, Pressure maintenance/control system, valves, heat meters...)
2 - Do I have to create a construct for each level of my building?
(Like a construct for the ground floor, one for the pit and one for my pump sump)
Thanks in advance for your contributions