Hi, is there any solution that I can set up the measurement of Dimension angular (in properties) as the same as the one shown in the project?

0 Me gusta
Responder
Soluciones aceptadas (1)
449 Vistas
6 Respuestas
Respuestas (6)

Kent1Cooper
Consultant
Consultant

If you mean that you want to be able to show the 270° angle, like this:

Kent1Cooper_0-1699363051419.png

you can do that by not just selecting the lines, but using the specify-the-vertex option:

 

DIMANGULAR
Select arc, circle, line, or <specify vertex>:  {Enter to accept specify-vertex option}
Specify angle vertex: {pick at intersection or apparent intersection}
Specify first angle endpoint:  {pick on rightward line}
Specify second angle endpoint:  {pick on downward line}
Specify dimension arc line location or [Mtext/Text/Angle/Quadrant]:  {the usual}
Dimension text = 270

Kent Cooper, AIA

Valentin-WSP
Mentor
Mentor
Solución aceptada

@tranhang13798 ,

 

To have an Angular dimension show as 270 on the Properties, make your Directional Control (Base Angle) West.

[Note: The default is East] - this will show the measurement exactly as on the dimension.

 

 

ValentinWSP_0-1699364317843.png

 

ValentinWSP_1-1699364373697.png

 

 



Please select the "Accept as Solution" button if my post solves your issue or answers your question.


Emilio Valentin

tranhang13798
Participant
Participant

Thank you for your brilliant solution..... It finally works. Just for further concerns, what are the function of Direction control? if I changed so any changes in value of dimensions I have done before?

Patchy
Mentor
Mentor

It doesn't affect the dimensions but it does control the way surveyor's work. Survey use clockwise to measure angle, Autocad uses counter-clockwise for default.

tranhang13798
Participant
Participant

I gonna use this solution in an alignment drawing which is already coordinated with survey coordination. just wanna make sure again how much will make hard for surveyor in future? 

0 Me gusta

Valentin-WSP
Mentor
Mentor

@tranhang13798 ,

 


@tranhang13798 wrote:

... just wanna make sure again how much will make hard for surveyor in future? 


 

This is a question you should discuss with the surveyors.

 

Remember you can reference the file and not affect the original.



Please select the "Accept as Solution" button if my post solves your issue or answers your question.


Emilio Valentin