Edit PLC Module
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Dialog window « Edit PLC Module ».
If i click the "Project" button, then in the "PLC I\O Points Used" dialog box i can select the address of the point, and this data will be copied for the new point.
If i click the “Drawing” button, i can select the point address in the “PLC I/O Point List (this drawing)” dialog box, but the data is not copied.
Why?